1, the connection is good hopper or feed tube, and the discharge port, or the material circulation pipe. Connected to the cooling water pipes and exhaust drain pipe.
2, installed electric starter, coupled with ammeter and indicator. Connected to the power steering motor discrimination should start running from the inlet should look for in a clockwise direction.
3. Adjust the grinding gap, the two handles Loosen (counterclockwise twist) and then adjusting ring clockwise rotation of motor fan base with one hand into the inner side of the mouth, when turning the ring to feel a little friction to stop immediately. Then reverse the adjustment ring makes grinding a little larger than the gap aligned figures, usually in the case of processing of materials to meet the requirements of fineness, grinding gap as much as possible to make some big sales. This allows some grinding and long service life. Then tighten the handle clockwise to lock the adjustment ring, so grinding gap fixed.
4, thorough disinfection and cleaning of the body interior.
5, connected to the cooling water, to start immediately after the colloid mill to be operating normally feed into the mill processing. Empty operation shall not exceed 15 seconds.
6, the processing of materials does not allow quartz, crushed glass, metal shavings mixed with hard material base, otherwise the mill will damage the dynamic and static grinding.
Want to learn more colloid mill can be viewed in Wenzhou Hao Star Machinery Machinery official website. http://www.86999999.net Colloid Mill Operation
©2015 Zhejiang Hao Star Machinery Equipment Manufacturing Co., Ltd. All Rights Reserved